Wastewater
Residential, Commercial and Industrial:
Waste Water Rates:
Effective April 1, 2020, each metered service connection, both inside and outside of the City, will be billed monthly for the applicable Ready to Serve Charge plus the Consumption Charges wastewater service as reflected on the Table of Wastewater Rates
| Sewer Rates | ||||
| “Ready To Serve” Monthly Charge | ||||
| Meter Size | In City | Outside | ||
| 5/8″ | $50.00 | $75.50 | ||
| 1″ | $63.65 | $96.11 | ||
| 1 1/4″ | $72.70 | $109.78 | ||
| 1 1/2″ | $81.80 | $123.52 | ||
| 2″ | $131.80 | $199.02 | ||
| 3″ | $500.00 | $755.00 | ||
| 4″ | $613.60 | $926.54 | ||
| 6″ | $954.55 | $1,441.37 | ||
| 8″ | $1,318.20 | $1,990.48 | ||
| Unmetered | ||||
| All | $100.00 | N/A | ||
| Consumption Charge per 100 gallons | ||||
| (Based on 80% of water used) | ||||
| Classification | In City | Outside | ||
| Residential | $0.572 | $0.865 | ||
| Commercial | $0.629 | $0.951 | ||
| Industrial | $0.629 | $0.951 | ||
Waste Water Impact Fee Chart:
Waste Water Impact Fee Determination Commercial and Industrial
